Project Responsibilities

Whole Foods (formerly Nature’s) and Fremont Place

Project Responsibilities: I was the project engineer for this project from the early design phase all the way through to the construction administration. The grocery store portion was a remodeled building with a new addition to increase the store space. I had to modify the existing portion to bring it up to current code standards as well as reinforce existing members. The lateral resistance was provided by new moment frames. The retail space to the south was all new construction. In addition to the primary design I was responsible for the secondary design work such as the wine storage entrance.

Firm Employed with: James G. Pierson, Inc. / Architect: Richard Brown Architecture.

Back 1 page

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s