Project Responsibilities

Columbia Building:

Project Responsibilities: I coordinated with the architect at the start of the project to understand the parameters of the project. The building was a 3-story building, with 2 apartments on the 3rd floor, retail space on the street level (2nd floor south side of the building) and parking and storage on the parking lot side (north side). The structure was a wood framed plywood sheathed system for both lateral and gravity loads for the 2nd and 3rd floor levels with wood shear walls on the east/west walls down to the foundation. A moment frame on the north wall at the 1st level. I prepared and assembled the design documents and worked on the construction administration until completion.

Firm Employed with: James G. Pierson, Inc. / Architect: NA.

Back 1 page

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s